top of page

Demonstration of unloading of the material and assembly of panels of pressed straw. Assembly is carried out within 3 days, and as you can see, it is considered an "easy" assembly.

Seismic testing of towed straw panels.
The test conducted at University of Nevada, USA

Two houses with 47m2 (2017)
Construction carried out in Vale de Santarém, Santarém.

Test of fire placed on the panels of towed straw.
The test performed in Germany.

Customer opinion about houses with 47sqm (2017)
Construction carried out in Vale de Santarém, Santarém.

Two houses with 47m2 (2017)
Construction carried out in Vale de Santarém, Santarém.

Fire test and the results obtained
Test performed with panels of the pressed straw and the results obtained at the end pf the video.

House with T2 (2018)

Construction carried out in Lagoa de Albufeira, Sesimbra.

House with T2 (2018)

Construction carried out in Lagoa de Albufeira, Sesimbra.

bottom of page